Design services
An assessment for every stage of a chip project.
Before you commit engineers, masks or wafers, have the design read by a team that takes chips from architecture to tape-out. Each assessment has a scope agreed in writing and ends in a written report.
- Scope
- Agreed in writing before work starts, for one stage or several
- You provide
- What you hold today: a specification, RTL, a netlist or a layout
- You receive
- A written report: findings in order of risk, the evidence behind each, recommended actions, and the next stage scoped and priced
- Afterwards
- Continue with us under one of four engagement models, or with your own team
By stage
Start from what you hold.
ASIC feasibility study
From an idea or a specification: should this be an ASIC, and what would it take?
ASIC cost estimate and process node selection
From a specification and target volumes: what will it cost, on which process, by which route to first silicon?
RTL assessment
From RTL: is it ready for synthesis and physical design?
Verification review
From a testbench and coverage results: has the design been verified far enough to build?
PPA assessment
From RTL or a netlist: what power, performance and area will it reach?
Physical design and sign-off review
From a netlist or a layout: will it close, and are the sign-off checks complete?
Tape-out readiness review
From a design near completion: is everything in place before the masks are ordered?
Full-custom assessment
From a standard-cell design: which blocks would full-custom design improve?
Production transfer assessment
From a chip already in production: can production move, and what does the move involve?
By starting point
Or start from where you are today.
Algorithm to ASIC
For an algorithm that runs in software today.
GPU to ASIC
For a workload that runs on GPUs, including AI inference.
FPGA to ASIC conversion
For a product that ships on an FPGA.
RTL to GDSII
For RTL that needs a back end.
Process migration
For a chip on another process node or at another foundry.
How it runs
Four steps, agreed before work starts.
Onboarding
New clients start with onboarding; established companies can apply for a fee waiver.
NDA and hand-over
We sign a mutual NDA, then receive your data through an agreed channel.
Review
Our engineers read the data against the scope agreed in writing.
Report and next step
A written report, a session to go through it, and a scope and quotation for what follows.
Questions about assessments
Which assessment do we need?
Start from what you hold. A specification points to a feasibility study or a cost estimate; RTL to an RTL assessment or a PPA assessment; a design near completion to a tape-out readiness review. Tell us what you have and we will suggest one.
Can one engagement combine several assessments?
Yes. The scope is agreed in writing before work starts, and it can cover one stage or several.
Do we have to continue with Chipchain afterwards?
No. The report is written so that any team can act on it. If you continue with us, one of our four engagement models can follow.
Which processes do you assess?
We are a TSMC direct account, and our design work covers FinFET nodes at 16 nm, 12 nm, 7 nm and 6 nm. For customers we have also designed compute-accelerator ASICs on 28 nm and 8 nm, delivered as GDS.
How is our design data protected?
Every project runs under a mutual NDA, with access limited to the named project team; ownership of the design and its data is set in each project's contract.
Related pages
Not sure where to start?
Tell us what you hold: a specification, RTL, a netlist or a layout. We will suggest the assessment that fits.
- Fill in the project form
- We reply by email within a few working days
- Onboarding: NDA, design review and a staged plan
The form is the fastest way to reach us. A person reads every request.